Leeds ICEPS

Sir William Henry Bragg Building, University of Leeds, Woodhouse, Leeds, LS2 9JT

Leeds ICEPS Headline Facts:

90 reconstructed stone precast concrete panels, covering 659 sqm of facade.

Architect: ADP Architecture

Contractor: BAM Construction

Science Teaching Hub

Science Teaching Hub, University of Aberdeen, Bedford Road, Aberdeen, AB24 3AA

Science Teaching Hub Headline Facts

254 precast concrete panels, covering 3,696 sqm of facade.

Architect: Reiach and Hall Architects

Contractor: Robertson Group

Assembly Bristol, Building C

Assembly Building C, Cheese Lane, Bristol, BS2 0JJ

Assembly Building C Headline Facts:

60 precast concrete panels, covering 918 sqm of facade.

Architect: Allford Hall Monaghan Morris

Contractor: PCE Ltd

Premier Inn, Castleforbes

22 Sheriff Street Upper, North Dock, Dublin 1, D01 P3F4

73 precast concrete panels, covering 731 sqm of facade. 19m long entrance beam with 2 supporting arrow-shaped columns.

Architect: O’Mahony Pike Architects

Contractor: Collen Construction

Fulton & Fifth

 Fulton & Fifth, Fulton Road, Wembley, London HA9 0TF

Headline facts :

1,968 precast concrete panels, covering 26,220 sqm of facade.

Architect: JTP / Ryder

Contractor: PCE Ltd

Southbank Place, B7

Southbank Place, B7, Belvedere Road, Southbank, SE1 7AF

Headline Facts:

310 precast concrete panels, covering 2,900sqm of facade.

Architect: Axis Architects

Contractor: McAleer & Rushe

Hawthorne House (Jubilee – under construction)

Hawthorne House, Farthingale Walk, London E15 1AN

Headline Facts:

989 precast concrete panels, covering 13,813sqm of facade.

Architect: Falconer Chester Hall

Contractor: RG Group

10 King William Street (under construction)

10 King William St, London EC4N 7TW

Headline Facts:

249 natural stone facing and reconstructed stone precast concrete panels, covering 3,650 square meters of the facade, manufactured offsite.

Contractor: McLaren

Architect: Fletcher Priest Architects

Logitech, City Gate Plaza Two

City Gate Plaza Two, Mahon, Cork, T12 A6RW, Ireland

Logitech Headline Facts:

198 precast concrete panels, covering 1,840 square meters of the facade, manufactured offsite.

Contractor: Summerhill Construction

Architect: Henry J Lyons Architecture

Begbroke Science Park

Begbroke Science Park, Mount, Yarnton, Kidlington OX5 1PF, United Kingdom

Headline Facts:

320 precast concrete panels, covering 4,800 square metres of the facades of two buildings.

Contractor: MaceGroup

Architect: NBBJ Architects

Marshall Yards, East Road, Dublin

Marshall Yards, East Road, Dublin 1

Headline Facts:

Project in Numbers: 615 brick-facing and reconstructed stone architectural precast concrete panels, manufactured offsite, covering 6,500 sqm.

Contractor: Bennett Construction

S3, Kings Cross

S3, One Keskidee Square, 1121 Canal Reach, London, N1C 4BE

S3 Kings Cross Headline Facts:

Project in Numbers: 178 reconstructed stone and glazed brick-facing panels, manufactured offsite, covering 2,233 sqm.

Contractor: BAM Construction

Architect: AHMM

Bettystown Library

Bettystown Library, East Meath Civic Centre, Seaview Terrace, Bettystown, Co. Meath, C15 P668

Bettystown Library Headline Facts:

Project in Numbers: 208 reconstructed stone panels, manufactured offsite, covering 1,464 sqm.

Contractor: Cumnor Construction

Architect: Robin Lee Architecture

One Linear Place, Nine Elms

One Linear Place, Ponton Road, Nine Elms, SW11 7BA

One Linear Place Headline Facts:

Project in Numbers: 427 reconstructed stone panels punch windows, 3-storey height, manufactured offsite, covering 15,040 sqm.

Contractor: London Square

Architect: Architectus | Allies & Morrison

Castleforbes

Castleforbes Business Park, North Wall, Dublin 1, D01 E023

The Carraigeworks, Castleforbes Headline Facts :

Project in Numbers: 487 brick-facing panels, covering 8,072 sqm.

Contractor: John Paul Construction

Architect: O’Mahony Pike Architects

Brent Cross Town, Plot 14

Brent Cross Town, Plot 14, London BX14

Brent Cross Town Headline Facts:

Contractor: PCE / Galliford Try

Architect: Allies & Morrison

Clare County Library

Clare County Library, Causeway Link, Clonroad Beg, Ennis, Co. Clare

Clare County Library Headline Facts:

Project in Numbers: 82 reconstructed stone panels, covering 1,291 sqm.

Contractor: Coolsivna Construction

Architect: Keith Williams Architects

Derby Business School

The Cavendish Building, Derby Business School, Kedleston Road, Derby DE22 1GB

Derby Business School Headline Facts:

Project in Numbers: 173 reconstructed stone panels, covering 2,272 sqm.

Contractor: Kier Construction

Architect: CPMG Architects

University Technical College, Leeds

UTC Leeds, Sayner Rd, Leeds LS10 1LA

UTC Headline Facts:

Project in Numbers: 745 reconstruction stone panels, covering 7,318 sqm.

Contractor: McAleer & Rushe

Architect: DLA Architecture

The Silver Yard, Exchange Square

The Silver Yard, Exchange Square, The Priory Queensway, Birmingham B4 6FY

600 reconstructed stone panels, covering 14,000 sqm.

Contractor: McAleer & Rushe

Architect: Stephenston Studio