Osier’s Road

Osiers Road, Wandsworth, London, SW18 1NL

Headline Facts:

773 reconstructed stone and brick-facing panels, covering 9,916m2.

Contractor: Hollybrook Homes

Architect: Burwell Architects

UCL East, Pool St. West

Pool St. West, Montfichet Rd, London E15 2JE

Pool St West Headline Facts:

1136 precast concrete panels constructed offsite, covering 16,530m2 of the 3 towers and podium base.

Contractor: Vinci Construction

Architect: Lifschutz Davidson Sandilands

LSE, Paul Marshall Building

44 Lincoln’s Inn Fields, London WC2A 3PX

LSE Headline Facts:

1,170 precast concrete panels constructed offsite, covering 12,124m2. The facade comprises flat wall panels, double height fins, soffits and benches.

Contractor: Mace

Architect: Grafton Architects

Marshgate

UCL East, Marshgate, Montfichet Rd, London E15 2JE, UK

Marshgate Headline Facts:

795 precast concrete panels constructed offsite, covering 16,360m2 of the facade.

Contractor: Mace

Architect: Stanton Williams
Interior Architects: Stanton Williams and Sheppard Robson
Delivery Architect: Sheppard Robson

The Finer Details:

Along with Pool Street West, Marshgate is part of the expansion of UCL East, a new world-class University College London campus located at Queen Elizabeth Olympic Park. Marshgate will encompass mainly an academic centre, but will also include retail, community and engagement uses. Marshgate is one of six recent Techrete projects at Queen Elizabeth Olympic Park and we are proud to play such an integral part in the historic and important development of the area.

Our facility in Dublin produced the early samples for three ‘neighbourhoods’ as well as prototypes and sample panels, while the main panel production and window fitting took place at our Brigg facility.

The project completed in September 2021 with full building completion early in 2022.

Wood Wharf G3

Wood Wharf G3,100 Preston’s Road, London E14 9SB

Wood Wharf Headline Facts:

28 storey residential tower with 307 reconstructed stone panels constructed offsite, covering 3,857m2

Contractor: Canary Wharf Contractors

Architect: Allies and Morrison

Kings Cross P2

113 King’s Cross Rd, Kings Cross, London WC1X 9LR

Kings Cross P2 Headline Facts:

1,023 reconstructed stone panels constructed offsite, covering 9,715m2

Contractor: Kier / Argent

Architect: AHMM

Orchard Wharf

 Orchard Wharf, Silvocea Way, London E14 0JJ, United Kingdom

Orchard Wharf Headline Facts:

928 brick-facing panels covering 8,009m2

Contractor: CJ O’Shea Contracting

Architect: BUJ Architects

Athlete’s Village No. 3 & 4

Athlete’s Village No. 3 & 4, Victory Parade, East Village, London E15 2ER

Athlete’s Village No. 3 & 4 Headline Facts:

2,065 reconstructed stone and brick faced panels, constructed offsite and covering 17,199m2 of the facades.

Contractor : Lendlease

Architect : Patel Taylor Architects

Athlete’s Village No. 2

Athlete’s Village No. 2, Victory Parade, East Village, London E15 2ER

Athlete’s Village No. 2 Headline Facts:

1,035 precast concrete panels constructed offsite, and covering 8,866m2 of the facade.

Contractor: Ardmore

Architect : Lifschulz Davidson Sandilands and KDS Associates

Commercial Road

73 – 77 Commercial Road, London E1 1RD

Commercial Road Headline Facts:

223 sandwich panels, constructed offsite, covering 2,562m2.

Contractor : PCE

Architect: Dexter Moran Associates

Kingston University Townhouse

Penrhyn Road, Kingston upon Thames KT1 2EE, United Kingdom

Kingston University Townhouse Headline Facts:

473 reconstructed stone columns and beams, covering 4,356 square meters.

Contractor : Willmott Dixon

Architect : Grafton Architects

10 The Broadway

10 The Broadway, Westminster, London SW1H 0DJ

10 The Broadway Headline Facts :

1,311 reconstructed stone panels, covering 13,431 square meters of two of the towers and the podiums of all six buildings.

Contractor : Multiplex

Architect : Squire & Partners

Maiden Lane

Maiden Lane, Covent Garden, London NW1 9UQ

Maiden Lane Headline Facts :

2,228 reconstructed stone panels, covering 19,734 square meters.

Architect : PRP

Contractor : Sisk

Sovereign Court

Handley House, Sovereign Court, Hammersmith, London W6 0BT

Sovereign Court Headline Facts:

382 reconstructed stone panels, covering 3,060 square meters.

Contractor : St. George (Berkeley Group)

Architect :  Lifschutz Davidson Sandilands

Victoria Square

Victoria Square, Woking, London GU21 6DG

Victoria Square Headline Facts:

641 natural stone faced panels, covering 7,600 square meters.

Contractor : Sir Robert McAlpine

Architect : Benoy

The Temple

Shree Swaminarayan Mandir Kingsbury, Shree Muktajeevan Swamibapa Complex, Kingsbury Road, NW9 8AQ

The Temple Headline Facts :

224 reconstructed stone panels, covering 2,760 square meters.

Contractor : FDL

Architect : LTS Architects

Heathrow Express

Heathrow Express, Heathrow Airport, London TW6

Heathrow Express Headline Facts :

10,000 GRC panels, covering two underground stations at Heathrow Airport

Contractor : Laing Bailey JV

Architect : Wolfe Ollins

London Bridge, Shard

32 London Bridge St, London SE1 9SG

London Bridge Headline Facts :

1,500 square meters of GRC panels

Contractor : Mace

Architect : Renzzo Piano

Lancer Square

5A Kensington Church St, Kensington, London W8 4LD

Lancer Square Headline Facts:

469 natural stone faced and brick faced panels, covering 6,760 square meters.

Contractor : Mace

Architect : Squire & Partners

E05 Wembley Park

Wembley Park, Wembley, Brent, London

E05 Wembley Park Headline Facts:

1,610 brick faced and reconstructed stone panels with punched windows and Juliette balconies, covering 17,500 square meters.

Contractor : Sisk

Architect : PRP

The Finer Details :

Wembley Park is a transformational urban regeneration scheme in the heart of London, renewing the long-neglected space around the national stadium in London. It is creating a vibrant new district which will be home to the UK’s largest single-site build to rent scheme, with over 7,000 residential units, helping to address the UK’s shortage of affordable homes. Since 2004, a range of impressive projects have been delivered at Wembley Park, however the E05 project is the first time that precast concrete has been selected as the preferred facade at Wembley Park. Techrete were awarded the contract and works began in December of 2018.

E05 comprises 458 residences and associated amenities over three blocks, ranging between 10 and 21 storeys. Located immediately adjacent to the stadium, it also provides a linked basement car park for residents, a ground level coach park and two levels of accessible parking for Wembley Stadium. Sisk are expected to complete all works onsite by October 2020.

Within 18 months (December 2018 – May 2020), Techrete had designed, manufactured, and installed 1,610 architectural precast brick-faced panels, incorporating 2,000 windows and covering 17,500 square meters of the buildings facades.

Watch Installation Progress Video Here:

Video Courtesy of Quintain. Video Credit : Site Eye